top of page

Getting your swept path drawing is easy, simple and stress free.

We do all the work and make everything as quick and easy as possible for you.

Alex Proffitt

Swept Path Drawing Basics

Get Quote

Which vehicle would you like for your swept path?
Swept Path

In short, a swept path drawing is a way to prove thereis enough room for vehicles to safetly manoeuvre within a site.

 

Normal requirements for swept path drawings would be to show that access is possible by the largest vehicle needed to access the development.  This would usually be a large car, standard refuse vehicle or fire tender.

 

With prices starting from £140, our swept path service is one of the most cost effective around.  Every quotation includes 1 number revision within the price.

Previous clients include but are not limited to Magnavale, Glasdon Ltd, Cassidy and Ashton, ML Planning, Planning Problems Solved, Shard Developments, Mason and Marlowe and Avalon.

Our comprehensive database of vehicles is available for swept path drawings, so your requirements are fully covered.

 

Our experience includes but is not limited to:

 

  • Drive Thru Restaurant
  • ​Trailer storage
  • Warehouse
  • Driveways
  • Housing estates
  • Agricultural access
  • Car Park

Here's How it Works

contact
accept quote
upload documents
receive report

Step#1


Contact iRIS


Use the links to call or email iRIS so we can get some details and get the ball rolling.


 

Step #2

 

Accept the Quote

 

Within 1 working day you will receive a written quote. When you decide to accept, confirm with us that you want to go ahead.

 

 

Step #3

 

Send us Your Plans

 

Once we've received your work order, just attach a DWG copy of your floorplans or a link to your application on the planning portal via email and we can start on your facilities audit. A PDF file can be accepted if it is to an appropriate scale (1:500 or less) but this will necessarily cost more to process.

 

Step #4

 

Receive Your Swept P​ath Drawing

 

Your swept path drawing will be sent to you to review.  Check and if needed ask for your free revision.

Get Your Swept Path Drawing

When Will My Swept Path Drawing be Ready?

Most swept path drawings take less than 2 days however if you need it more urgently, let us know - we'll do what we can to accomodate this.

John Carruthers, VTC

iRIS prepare excellent Travel Plans and carry out Travel Plan monitoring services in a professional and reliable manner.  They are committed to promoting sustainable transport and development schemes.

Nigel Robinson, PPS

Great service , very reliable . Alex always does a thorough job and will advise where revisions are required.

Elise Hunt, Maincoat Ltd

Cannot recommend Alex at Iris Sustainable Planning enough for her highly professional service. From initial phone call, to site visit the entire experience was an absolute joy. Alex was thorough, detailed and concise both in her explanations to the final report 10/10
bottom of page