

Transport Consultant
What is a Healthy Streets Assessment?

A Healthy Streets Assessment is a requirement for larger developments in the Greater London Area to assess how safe and likely it is that the streets will be used by pedestrians and cyclists.
The check assesses 31 questions to compare 10 indicators and determine how a site scores now to how any improvements will change the score in the future.
If you are planning a larger development within London it is possible that you will be asked to provide a Healthy Streets Assessment.
​
It is not possible to acheive a 100% 'perfect' score in a Healthy Streets Assessment - after all there is always something that can be done to improve, however iRIS transport consultants can advse on the current and proposed street health indicators and advise on any way you can increase the score in the most cost effective method possible. We do this by working in conjunction with local councils and Transport for London (TfL) to agree a scope and carry out the assessment.
​
As Pedestrian Comfort Level forms a part of the assessment, it is likely that a Pedestrian Comfort Survey will need to be carried out in conjunction with a Healthy Streets Assessment.
Here's How it Works
Here's How it Works

Step #1
Step #1
Contact iRIS
Contact iRIS
Use the links to call or email iRIS so we can get some details and get the ball rolling.

Step #2
Step #2
Accept the Quote
Accept the Quote
Within 1 working day you will receive a written quote. When you decide to accept, confirm with us that you want to go ahead.

Step #3
Step #3
Send us Your Plans
Send us Your Plans
Once we've received your work order, just attach a pdf copy of your plans via email and we can start on your Healthy Streets Assessment

Step #4
Step #4
Receive Your Healthy Streets Assessment
Your Healthy Streets Assessment will be conducted, written and sent to you to review before you submit it to the planning department.
Get Your Healthy Streets Assessment
When Would My Healthy Streets Assessment be Ready?
Most Healthy Streets Assessments take 1 month from order to completion - but certain factors, including the response time of the local council, can affect how long this will take.
Based on current capacity Healthy Streets Assessments ordered today are expected to take:
Of course, if your site requires a Healthy Streets Assessment but want to book in for completion at a date and time in the future to suit you, you're quite welcome to do this!
Our Clients Include:
Our Clients Include:
Edwardson Associates Ltd - Driffield • Index Assets and Consulting Ltd - Solihull • The Maples Country Park - Hornsea • Rick Bestwick Ltd - Chesterfield • Golborne Properties LLP - Warrington • Breck Homes - Blackpool • Dalfour Ltd - Colne • Smith and Love - Preston
• PSA Design - Longridge • VTC - Penwortham